Address

Author Topic: Fluid handling robot build Sunday 9/21/2014  (Read 787 times)

da3v

  • Moderator
  • Full Member
  • *****
  • Posts: 114
    • View Profile
Fluid handling robot build Sunday 9/21/2014
« on: September 15, 2014, 05:20:18 PM »
As part of our collaboration with GenSpace for this year's iGEM competition, we need to get a variant of this (http://www.opentrons.com ) put together.


I have most of the parts we need, but still need to print a few in ABS.  Do we have a printer set up for ABS these days?


Part of what we will be doing is testing the assembly instructions, so if we can get a few folks helping out with each of the sub-assemblies, we should be able to get a lot of this thing done Sunday afternoon.



[/size][size=78%] [/size]

Iggy

  • FamiLAB Member
  • Newbie
  • *
  • Posts: 34
    • View Profile
Re: Fluid handling robot build Sunday 9/21/2014
« Reply #1 on: September 15, 2014, 08:40:02 PM »
Our only ABS printer is almost running. Apologies, I intended to get it running during MakerFaire but I found no time to spare. It needs to have it's Y axis belt re-attached followed by a bed leveling. If things go smoothly, it should only take 30 minutes. I'll try to get to the lab tonight or tomorrow morning to make it happen.